When corruption is dressed in the robes of bureaucracy, even good intentions die on arrival

James Navo Massaquoi: Sierra Leone Telegraph: 28 November 2026:

When the Minister of Lands, Housing and Country Planning, Dr Turad Senesie (Photo above) directed that the public must first obtain building permits and other documents before constructing any building, it was hailed as one of the most fundamental shake-ups in the ministry.

This is not to suggest that Building Permits, as requirements for constructing building structures is a new concept or requirement.

Although some people have expressed criticisms that the Minister’s decision was unilateral and did not go through parliament, and therefore did not pass the legislative litmus test, it must be noted that it is entrenched in the law of the land already. The minster was not inventing the wheel.

There should be no guesses for why such a requirement is being passed and reinforced recently. It is no secret that ill trained and non-trained builders have rained considerable heart aches on our citizenry.

In Sierra Leone, anyone with one brain cell can call themselves “contractors”. They masquerade as builders with no certified qualifications to do so. A lot of our builders consider themselves certified, thanks to working as handymen for their bosses over the years.

While many would wonder at the apparent “sweeping” re-introduction or reinforcement of the Building Permit as a requirement, it is worth noting that the nation, and especially Freetown has witnessed a spate of several high-rise buildings collapsing with fatal outcomes.

No one needs a degree in mechanical engineering or otherwise to conclude that such disasters have been as a result of badly constructed buildings, thanks to little or no regulations, supervisions or implementations.

Sadly, the mudslide that took place in the environs of Regent is a painful reminder of the consequences of ill planning and unregulated building practices. Have people learned from that experience? Take a walk around the same place and you get your answer.

One of the most corrupt and unscrupulous industries in our country is the building trade. From substandard products, or materials to dishonest contractors, builders, labourers etc., the industry is so infested with thieves, crooks and dishonest people that anyone trying to build a house would be forgiven to think that they are playing a game of cops and robbers.

The number of horror stories coming from people trying to build a roof over their heads, at the hands of these unscrupulous people is unbelievable. It is not surprising that one of the most common reasons for the collapse of those structures are due to the use of substandard and insufficient composites. The most common is cement – sand ratio, where corners are cut to make quick bucks.

So when the Minister reinforced the need to get building permits and survey documents, many well-meaning citizens who otherwise saw this move as overdue, welcomed it as a positive to way to reduce the spate of tragedies that are befalling the building trade. Unfortunately, it appears that there were no guardrails implemented to mitigate against our propensity to be corrupt.

It is unquestionable that second to our national harbour, which is fondly called “deep Wata Key”, the ministry of lands is the most corrupt institution. It is the ministry that oversees portions of lands sold to two or more people, with each producing genuine and legal ownership documents with the same signature.

The case of land grabbing cannot be overemphasised, and many believe that this is done with the connivance of staff in the ministry. The worst victims are people in the diaspora. All the miscreants need to know is that the owner of a piece of land is staying anywhere but in the country.

There are people who recount that having bought their pieces of land, they spend years fighting to prove their ownership in the courts, thanks to the devious behaviours of officials in the ministry.

To all intents and purposes, many who welcomed the minister’s initiative to reinforce the requirement of building permits and surveys, now find themselves as double victims of ministry officials.

Imagine someone ready to undertake their building odyssey. They make arrangements with their contractors, suppliers, labourers etc. They apply for their building permit and survey, only to be delayed for months on end. That is when the new vocabulary along the corridors of the ministry becomes “de system dae don”, “light nor dae”, “De pa nor sign am yate”, “De pa nor cam tiday” etc.

So, what happens when the individual has the money stashed in banks or mattresses all over the place?

Meanwhile, inflation continues to pose a risk to air traffic as the dollar exchange rate takes its proverbial projectile approach towards the financial galaxies. In the end, even with the best of intentions, people will be forced to take short cuts, resort to drastic measures and flout the rules.

In doing so, you can bet your bottom dollar that same officials in the ministry will be the very ones to tell, instruct and oversee the flouting of these requirements for a fee.

If the minister does not prescribe a time limit from application to issuance of these documents, his lofty ideas will be dead on arrival. The issuing of building permits should never be at the discretion of the officials. Except if the Minister is aiming to provide another cash cow for those corrupt officials, his directive should be followed by a nationally publicised stipulated time for the whole process.

The Minister and his ministry should ensure that the time scale from application to issuance is strictly adhered to. Where such timescale is not adhered to, there should be a process by which customers can seek redress and steps taken to address these, by hauling those corrupt and heartless officials over hot coals.

If there are no guardrails to mitigate against these corrupt officials, then the minister would have failed woefully. This is about implementation. It is one thing to dream up lofty, though well-meaning ideas for development. It is an entirely different thing to ensure that it is implemented.

Unfortunately, if these changes are not properly policed and implemented, it will leave the public at the mercy of those rogue officials in the ministry again. The minister’s policy, despite the well-meaning intentions will be dead on arrival, as it will just create another honey pot for the rogues. In the end, it will be another headline grabbing hot hair with no bite.

These are a few suggestions many think might help in this drive:

1-Direct the ministry to immediately release all duly paid for survey documents and permits.

2-Institute a transparent, time-bound/limit system for issuing permits and other survey documents.

3-Investigate the payments made and the cause of the delay for every application made by people who feel aggrieved or complainants.

4-Take corrective actions to ensure that these don’t happen again.

Mr Minister, your initiative is nothing short of admirable, but it will be dead on arrival if you don’t go further to ensure that timescales are provided, policed and implemented. Please don’t create another honey pot or side hustle for these rogues.

People want to be law abiding citizens who trust the system. They believe your intervention is well-meaning and will bring relief to thousands of families and restore public confidence.

However, despite the best of intentions, the Minister will create a readily available pool of victims at the hands of these rogue elements, if the rules are not implemented. It will be double jeopardy if the public is not protected from the fangs of these heartless enemies of the state.

Over to you Minister Dr Turad Senesie, and by extension Rtd Dr Julius Maada Bio.

Be the first to comment

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.